污污草莓视频

Please be advised that 污污草莓视频 University has mandated Rainville et Fr猫res to carry out the following project:听19-163 McCall MacBain Arts 鈥 Masonry work.

Final phase of the masonry restoration on two facades of the west side of the McCall MacBain Arts Building.

Construction start date: June 17th, 2024

Planned construction end date: September 17th, 2024

Work schedule: Monday to Friday, 6 a.m. to 3 p.m.

Classified as: Arts Building, McCall MacBain Arts Building
Published on: 7 Jun 2024

Please be advised that 污污草莓视频 University has mandated Constructions Seni Inc. to carry out the following project:听19-078 Otto Maass Chemistry 鈥 CFI IF 2020, Cooke.

The project consists of the transformation of the existing wet laboratory OM 025 into a dry laboratory to accommodate new class-4 lasers.

Construction start date: June 10, 2024

Planned construction end date: January 2025

Work schedule:听Monday to Friday, 6 a.m. to 3 p.m. Additional hours to be coordinated with affected stakeholders.

Classified as: Otto Maass Chemistry
Published on: 31 May 2024

Please be advised that 污污草莓视频 University has mandated Ceveco Inc. to carry out the following project:听19-016 Reconstruction of Upper Main Road, Downtown Campus

This project consists of the reconstruction of the Upper Main Road, from the Y intersection to the McCall MacBain Arts Building, including underground work.

Construction start date: June 17, 2024

Planned construction end date: October 2025

Work schedule:听Monday to Friday, 6 a.m. to 7 p.m., Saturday, 6 a.m. to 7 p.m.

Classified as: main road
Published on: 29 May 2024

Please be advised that 污污草莓视频 University has mandated C茅leb Construction lt茅e. to carry out the following project:听17-004 Burnside 鈥 Electrical distribution and infrastructure upgrade.

The project consists of the upgrade of the vertical power distribution system. Includes mechanical, electrical, and architectural work.

Construction start date:听June 2024

Planned construction end date:听October 2025

Work schedule:听Monday to Friday, 6 a.m. to 10 p.m., with some nights and weekend work to be coordinated with the Building Director.

Classified as: Burnside Hall
Published on: 24 May 2024

Please be advised that 污污草莓视频 University has mandated Corenov Constructeurs Inc. to carry out the following project:听22-014 Lyman Duff (B169D) 鈥 Gatehouse interior renovation.

This project consists of a complete interior renovation of the Gatehouse to transform the wet labs into workstations and offices areas.

Construction start date:听May 27, 2024*

* Pending on the Ville de Montreal construction permit: not yet received. Preliminary mobilization/site preparation has started.

Classified as: Lyman Duff
Published on: 24 May 2024

Please be advised that 污污草莓视频 University has mandated St鈥怐enis Thompson Inc. to carry out the following project: 22-035 MNI (B159) & Duff (B169) 鈥 Envelope repairs

The scope of work includes repair of the foundations, replacement of stones and replacement/addition of handrails to the exterior stairs of the main entrances to the Lyman Duff Building and the Montreal Neurological Institute, located on University Street.

Construction start date:听May 13, 2024

Planned construction end date:听June 30, 2024

Classified as: Montreal Neurological Institute, Lyman Duff
Published on: 6 May 2024

Please be advised that 污污草莓视频 University has mandated Groupe Geyser to carry out the following project:听19-167 Strathcona Music Building 鈥 Renovation of Pollack Hall听

Description: The project consists of the renovation of Pollack Hall to enhance the user experience and improve accessibility.听

Construction start date:听May 2024听

Planned construction end date:听December 2025听

Classified as: Strathcona Music
Published on: 15 Apr 2024

Please be advised that 污污草莓视频 University has mandated Les Entreprises NR Brosseau to carry out the following project:听18-010 Downtown Campus 鈥 Modification of classroom locks in McConnell Engineering, Trottier and Wong buildings.

The project consists of the modification of classroom locks, including door hardware, to permit locking the doors from inside the classroom, either electronically or mechanically. More information on lockdown buttons.

Published on: 12 Apr 2024

Please be advised that 污污草莓视频 University has mandated Adams Elevators Inc. to carry out the following project:听17-004 Burnside - Modernization of the elevators.

Construction start date (UPDATED): June 2024

Planned construction end date:听March 2025

Work schedule:听Monday to Friday 6 a.m. to 3 p.m.

Project Manager:听Simon Lacoste -听simon.lacoste [at] mcgill.ca

Classified as: Burnside Hall
Published on: 8 Apr 2024

Please be advised that 污污草莓视频 University has mandated St-Denis Thompson to carry out the following project:听16-135 Strathcona Music 鈥 Rehabilitation of building envelope Lot 4.听听

Building envelope restoration of South, East and North stone masonry facades. Construction is expected to last three years and will be carried out during the spring, summer and fall periods of 2024, 2025 and 2026.听

Construction start date: April 2024听

Planned construction end date: November 2026听

Classified as: Strathcona Music
Published on: 3 Apr 2024

污污草莓视频 University has mandated CORENOV to carry out the following project: 19-117 Rutherford Building 鈥 CFI IF 2020, Brunner.

The project consists of renovating room 025 in the first basement of Rutherford Building to accommodate new equipment for the lab. Minor interventions will take place in rooms 003, 024A, 026, 027, 029A,030, B1-HALL2 & B1-HALL5A.

Construction start date:听March 25, 2024

Planned construction end date:听End of September 2024

Classified as: Rutherford Building
Published on: 21 Mar 2024

污污草莓视频 University has mandated F.A.M.G. Contractors to carry out the following project: 14-140 Life Sciences Complex 鈥 Address water leaks in curtain wall.

The work consists of stripping the outer layer of the wall of the mechanical shaft at room 140. The wall will remain stripped for a short period of time to complete the survey before proceeding with reconstruction.

This is the first phase of the project that soon will address the repair of damages in the mechanical shaft at room 140.

Construction start date:听March 18, 2024

Published on: 14 Mar 2024

污污草莓视频 University has mandated鈥Construction G.E.P. Inc.鈥to carry out the following project:听McIntyre, Stewart Biology North Wing, Life Sciences, and Ludmer / 23-005 - Repairs in various research spaces.

This project includes necessary repairs in various research spaces across the downtown campus. Repair work includes patching floor finishes, painting walls and ceilings, and new window covers.

Project manager:听Emika Marinacci -听Emika.marinacci [at] mcgill.ca

Published on: 28 Feb 2024

污污草莓视频 University has mandated Corenov to carry out the following project: Life Science Complex / 21-049 - CFI BRIF Vidal.

The project consists of renovating the CL3 laboratory in Life Sciences to accommodate new equipment and facilitate future maintenance work for the facility.

Project manager: Emika Marinacci -听emika.marinacci [at] mcgill.ca

Assistant project manager: Christine Torres -听christine.torres [at] mcgill.ca

Classified as: Life Science Complex
Published on: 29 Jan 2024

污污草莓视频 University has mandated Procova Incto carry out the following project: McIntyre Medical / 23-002听- Renovation of room 334 (third floor).

The project consists of the renovation of room 334 and the installation of 261 exam desks. It includes the installation of lockers on the second and third floors.

Project manager:听Wendy Rivera -听wendy.rivera [at] mcgill.ca

Classified as: Mcintyre building, McIntyre
Published on: 22 Jan 2024

Pages

Back to top